31.    Job evaluation is the method-of determining the
(a)    relative worth of jobs
(b)    skills required by a worker
(c)    contribution of a worker
(d)    contribution of a job
(e)    effectiveness of various alternatives.
Ans: a

32.    Micro motion study is
(a)    analysis of a man-work method by using a motion picture camera with a timing device in the field of view
(b)    motion study observed on enhanced time intervals
(c)    motion study of a sequence of operations conducted systematically
(d)    study of man and machine conducted simultaneously
(e)     scientific, analytical procedure for determining optimum work method.
Ans: a

33.    Per cent idle time for men or machines is found by
(a)    work sampling
(b)    time study
(c)    method study
(d)    work study
(e)    ABC analysis.
Ans: a

34.    TMU in method time measurement stands for
(a)     time motion unit
(b)     time measurement unit
(c)    time movement unit
(d)    technique measurement unit
(e)    time method unit.
Ans: b

35.    Time study is
(a)    the appraisal, in terms of time, of the value of work involving human effort
(b)    machine setting time
(c)    time taken by workers to do a job
(d)    method of fixing time for workers
(e)    method of determining the personnel Requirement.
Ans: a

36.    Work sampling observations are taken on the basis of
(a)    detailed calculations
(b)    convenience
(c)    table of random numbers
(d)    past experience
(e)    fixed percentage of daily production.
Ans: c

37. Which of the following equations is not in conformity with others
(a)    organisation performance x motivation = profits
(b)    knowledge x skill = ability
(c)    ability x motivation = performance
(d)    attitude x situation = motivation
(e)     performance x resources = organisation performance.
Ans: a

38.    One  time  measurement unit(TMU) in method time measurement system equals
(a)     0.0001 minute
(b)     0.0006 minute
(c)     0.006 minute
(d)     0.001 minute
(e)     0.06 minute.
Ans: b

39.    Basic motion time study gives times for basic motions in ten thousandths of
(a)     second
(b)     minute
(c)     hour
(d)     day
(e)     none of the above.
Ans: b

40.    Choose the wrong statement. Motion study is used for
(a)    improving a work method
(b)    improvising a work method
(c)    designing a work method
(d)     providing a schematic framework
(e)     reducing inventory costs.
Ans: e

41.    Gnatt chart provides information about the
(a)    material handling
(b)    proper utilisation of manpower
(c)    production schedule
(d)    efficient working of machine
(e)    all of the above.
Ans: c

42.    ABC analysis deals with
(a)    analysis of process chart
(b)    flow of material
(c)    ordering schedule of job
(d)    controlling inventory costs money
(e)    all of the above.
Ans: d

43.    Process layout is employed for
(a)     batch production
(b)    continuous type of product
(c)    effective utilization of machines
(d)    all of the above
(e)    none of the above.
Ans: a

44.    For a product layout the material handling equipment must
(a)    have full flexibility
(b)    employ conveyor belts, trucks, tractors etc.
(c)    be a general purpose type
(d)    be designed as special purpose for a particular application
(e)    arranging shops according to specialization of duties.
Ans: d

45.    Travel charts provide
(a)    an idea of the flow of materials at various stages
(b)    a compact estimate of the handling which must be done between various work sections
(c)    the information for changes required in rearranging material handling equipment
(d)    an approximate estimate of the handling which must be done at a particular station
(e)     solution to handling techniques to achieve most optimum^ results.
Ans: b