76.    Acceptance sampling is widely used in
(a)    batch production
(b)    job production
(c)    mass production
(d)    all of the above
(e)    none of the above.
Ans: c

77.    The technique of value analysis can be applied to
(a)    complicated items only
(b)    simple items only
(c)    crash programme items only
(d)    cost consciousness items only
(e)    any item.
Ans: e

78.    The term 'value' in value engineering refers to
(a)    total cost of the product
(b)    selling price of the product
(c)    utility of the product
(d)    manufactured cost of the product
(e)    depreciation value.
Ans: c

79.    Value engineering aims at finding out the
(a)    depreciation value of a product
(b)    resale value of a product
(c)    major function of the item and accomplishing the same at least cost without change in quality
(d)    break even point when machine re-quires change
(e)    selling price of an item.
Ans: c

80.    In the perpetual inventory control, the material is checked when it reaches its
(a)    minimum value
(b)    maximum value
(c)    average value
(d)    alarming value
(e)    original value.
Ans: a

81.    According to MAPI formula, the old machine should be replaced by new one when
(a)    CAM < DAM
(b)    CAM > DAM
(c)    CAM = DAM
(d)    there is no such criterion
(e)    none of the above.
(CAM = Challenger's Adverse minimum DAM = Defender's Adverse minimum)
Ans: a

82.    Merit Rating is the method of determining worth of
(a)    a job
(b)    an individual employee
(c)    a particular division in workshop
(d)     machine
(e)     overall quality.
Ans: b

83.    Material handling and plant location is analyzed by
(a)     Gnatt chart
(b)     bin chart
(c)     Emerson chart
(d)    travel chart
(e)     activity chart.
Ans: d

84.    Works cost implies
(a)     primary cost
(b)     factory cost
(c)     factory expenses
(d)     primary cost + factory expenses
(e)    none of the above.
Ans: d

85.    Motion study involves analysis of
(a)    actions of operator
(b)    layout of work place
(c)    tooling and equipment
(d)     all of the above
(e)     none of the above.
Ans: a

86.    Standard time as compared to normal time is
(a)     greater
(b)     smaller
(c)    equal
(d)    there is no such correlation
(e)    none of the above.
Ans: a

87.    Pick up the incorrect statement about advantages of work sampling
(a)    permits a fine breakdown of activities and delays
(b)    simultaneous study of many operators may be made by a single observer
(c)    calculations are easier, method is economical and less time consuming
(d)     no time measuring devices are generally needed
(e)     as operators are not watched for long periods, chances of obtaining misleading results are less.
Ans: a

88.    In which of the following layouts, the lines need to the balanced
(a)    process layout
(b)    product layout
(c)    fixed position layout
(d)    plant layout
(e)    functional layout.
Ans: b

89.    Which of the following layouts is suited for mass production
(a)    process layout
(b)    product layout
(c)    fixed position layout
(d)     plant layout
(e)     functional layout.
Ans: b

90.    Which of the following layouts is suited to job production
(a)    process layout
(b)    product layout
(c)    fixed position layout
(d)    plant layout
(e)    functional layout.
Ans: a