Realtime Tunnel Engineering Multiple choice Questions and Answers pdf

6.    Drifters can be used to drill
a)    only up holes
b)    only down holes
c)    horizontal or up holes
d)    horizontal, down or up holes

Ans: d

7. If 'N' is the number of shafts used, then the total number of feces available for attacking the excavation and construction in tunnels are
a)    2N
b)    N + 2
c)    2 N + 1
d)    2 N + 2

 Ans: d

8.    The correct sequence of drilling equipment for increasing size of holes in tunnels is
a)    wagon drill, churn drill, shot drill
b)    wagon drill, shot drill, churn drill
c)    shot drill, churn drill, wagon drill
d)    churn drill, wagon drill, shot drill

Ans: a

9.    Which of the following is not a component of the shield ?
a)    propelling jacks
b)    liner plate
c)    hood
d)    tail

Ans: b

10.    In compressed air tunneling, the volume of free air provided is
a)    6 mJ per second per m2 of face area
b)    6 m3 per minute per m2 of face area
c)    20 m3 per minute per m2 of face area
d)    6 m3 per hour per m2 of face area

Ans: b

No comments:

Post a Comment